Because not every architectural plan is designed around right angles, the DGH fire-wall hanger can be specified with a skewed or offset option. Like other models in the DG series, the hangers install on a two-hour wood-stud fire-wall during framing and allow two layers of 5∕8-in. gypsum wall board to be slipped into place after framing is complete.